Services Plant Relocation

Plant Relocation & Reinstallation Services

Controlled dismantling, transportation, reinstallation, and recommissioning of industrial plants and equipment.

Service Overview

We provide plant relocation and reinstallation services for industrial facilities that need to be moved, reconfigured, or recommissioned at a new location.

This service focuses on execution excellence under strict planning and safety control, ensuring that valuable industrial assets are relocated without damage, loss of performance, or extended downtime.

Ideal Client Profile:

  • Owns the equipment
  • Controls engineering decisions
  • Requires execution partner
  • Needs asset protection
When full responsibility for engineering and final process performance is required, this scope is delivered under our Solutions model.

Service Highlights

Category Execution
Risk Level High / Critical
Location Inter-City / Regional
Methodology Asset Preservation
Get Relocation Plan
Relocation Process

Scope of Service

Dismantling & Decom

  • Site assessment & strategy
  • Controlled dismantling
  • Electrical disconnection
  • Equipment preservation

Transportation Support

  • Packaging & securing
  • Loading coordination
  • Transport planning
  • Logistics interface

Reinstallation Works

  • Mechanical re-positioning
  • Alignment & leveling
  • Electrical reconnection
  • Utilities hook-up

Pre-Commissioning

  • Mechanical completion
  • Functional dry runs
  • Rotation checks
  • Commissioning support

Execution Control & Safety

Assessment & Planning
Controlled Dismantling
Transportation
Reinstallation
Pre-Commissioning

Planning First

Successful relocation depends on detailed planning before any dismantling begins.

Asset Preservation

Equipment protection (crating, securing, weather-proofing) is critical to preserve performance and value.

LEVEL: 0.00mm

Reinstallation Accuracy

Proper alignment and leveling ensure smooth commissioning and long equipment life.

Relocation Gallery

Dismantling

Dismantling & Handling

Safe Removal of Assets

Transportation

Transportation Logistics

Secured & Planned Moves

Reinstallation

Reinstallation

Alignment & Commissioning

Core Execution Team

  • Plant Relocation Managers
  • Mechanical Site Engineers
  • Installation Supervisors
  • Lifting & Rigging Specialists
  • HSE Officers
  • Logistics Coordinators

Tools & Equipment

Mobile Cranes Forklifts Rigging Gear Jacks & Skates

Tracking & Control

  • Tagging & Tracking Systems
  • Checklists & ITPs

Standards & Codes

Execution & Safety

OSHA, Approved Lifting Plans, Client HSE

Installation Quality

Manufacturer Manuals, ISO Procedures

Real-World Application

Feed Mill Relocation

Client Need: Relocate complete feed mill line to new site with minimal downtime.

Role: Relocation Contractor

Scope Delivered

Dismantling planning
Equipment protection
Transport coordination
Reinstallation & Alignment

Result:

Equipment relocated without damage, reduced downtime compared to replacement, smooth commissioning.

*Process optimization was outside service scope.

Responsibility Clarity

This service covers dismantling, transportation coordination, and reinstallation works.

Overall system engineering, optimization, and final performance remain under client responsibility unless delivered under a Solution model.

Why This Service Is Critical

Preserves Capital

Extends the life of expensive industrial assets.

Reduces Risk

Professional handling minimizes damage during moves.

Minimizes Downtime

Efficient execution gets production back online faster.

Plant Reuse

Enables cost-effective reconfiguration of facilities.